How do I turn Excel or Google Sheets rows into a Gantt chart in Confluence?

Copy rows from Excel or Google Sheets, paste them into the Gantt Chart from Text macro in Confluence, and it turns the rows into a chart.

Gantt Chart from Text for Confluence & Jira is on the Atlassian Marketplace: install it from the Marketplace. Free for up to 10 users, then US$0.40 per user a month, paid through Atlassian.

1. Copy your rows

Select the rows in Excel or Google Sheets and copy them. The copied cells come through as tab-separated columns.

2. Open the macro

In Confluence, add the Gantt Chart from Text macro to a page. Paste the copied text into the macro text box.

3. Check the columns

A header row is optional. Task, Name, Activity, Item, Step, or Deliverable can name the task column. Extra columns such as Owner or Status are ignored.

4. Add dates or length

Use start and end dates, or give a length in a Duration or Days column. A single date with no length becomes a milestone.

5. Preview and publish

The macro shows a preview and lists rows it cannot read. Save the page when the chart looks right.

Example rows as they arrive from a spreadsheet

Task    Owner    Start    Days
Plan    Asha    5-Jan-26    5
Build    Leo    12-Jan-26    20
Test    Mina    9-Feb-26    10
Launch    Asha    23-Feb-26

This draws four bars: Plan, Build and Test from their start date and number of days, and Launch as a milestone because it has one date and no length.

Dates and lengths it reads

  • Use 2026-01-05 for the clearest date format.
  • 1/5/2026 is read month first when the date is unclear.
  • 13/01/2026 is read day first, because 13 cannot be a month.
  • 5.1.2026 is always read day first.
  • 5-Jan-26 and 05-Jan-2026 both work.
  • 5d, 2 weeks, and 1 month can be used for length.

Questions

What if my dates come out wrong?

Use 2026-01-05 in the source sheet. Ambiguous slash dates like 03/04/2026 are read month first, so switch the column format to yyyy-mm-dd if needed.

Do extra columns matter?

No. Extra columns such as Owner or Status are ignored and do not break the chart.

Does the chart update when the spreadsheet changes?

No. It is a copy in Confluence, so if the spreadsheet changes you paste the rows again.

Does my plan leave Confluence?

No. The plan text stays in the Confluence macro, and nothing is sent to BrightDesk.

More on the macro itself: How do I make a Gantt chart in Confluence?

Last updated 24 November 2026.